Saturday, November 24, 2012

Building Progess

Daddy told the kids one morning if they worked really hard to get all of their school work done they could come with him to the church building that afternoon.  Well, they worked really hard, finished everything by lunch.  So, we had a little family time and went to the park for lunch before heading to the church building.  

They love picnics.  Scarlett enjoyed it too.

Olivia loves taking pictures.

They were begging Daddy to climb a tree.

He was eager and willing.

Trying to decide where he can place his
foot so that it is not eaten alive by the Gimongous ANTS.

Mr. Slow eater.


Deep in thought about something.


David and Jorje were able to remove the wall within a week.  This is a picture after the wall was removed and the temporary posts in place.  David and Jorje have since placed the permanent weight bearing beam (I took pictures, but Olivia deleted them because she was in need of more room on the memory card...so, I need to take more).  

The door to the left is the front door into the building and this is now the meeting area with the wall removed. The ceiling on the left was complete with sheetrock.  We have purchased the sheetrock for the right side.  We are needing to hire someone to come and do some plaster work, but not sure when that will happen right now.  Someone came by a couple of weeks ago to look at it but we do not have a price yet for the labor and supplies for the plaster.  It may have to  wait, along with painting.


Olivia and Scarlett playing
outside at church

Funny face

One of our church residents.

1 comment :

~Kristin~ said...

Just checking in on you...it's been a while... ;o)
XO